REHABILITATION OF BRIDGE STRUCTURE S109 ON SOUTHGATE

CLIENT

TOWN OF SOUTHGATE

LOCATION

SOUTHGATE, ONTARIO

DELIVERY-MODEL

BID-BUILD

YEAR COMPLETED

2021

SUMMARY OF WORK

  • Implementation of advanced temporary traffic control measures and controls.

  • Implementation of environmental measures and controls.

  • Removal of existing bridge components and elements.

  • Removal of existing concrete bridge deck edges and soffit repairs and rehabilitation.

  • New concrete parapet wall. 

  • Concrete removals and patches at partial and full depth. 

  • Removal of existing bridge expansion joints. 

  • Supply and installation of expansion joint assembly type A. 

  • Replacement of bridge deck drains.

  • Guardrail replacement and extension.

  • Bridge deck waterproofing and asphalt placement.

  • Road rehabilitation at the approach ends of the bridge.