MINTO LINE 12th BRIDGE REHABILITATION

CLIENT

TOWN OF MINTO

LOCATION

MINTO, ONTARIO

DELIVERY-MODEL

BID-BUILD

YEAR COMPLETED

2021

SUMMARY OF WORK

  • Implementation of advanced temporary traffic control measures and controls.

  • Implementation of environmental measures and controls.

  • Removal of existing bridge components and elements.

  • Removal of existing concrete bridge deck edges and soffit repairs and rehabilitation.

  • Supply and installation of bridge deck drains. 

  • Supply and installation of bridge expansion joint system. 

  • Guardrail replacement and extension.

  • Bridge deck waterproofing and asphalt placement.

  • Road rehabilitation at the approach ends of the bridge.

  • Removal & rehabilitation of deteriorated concrete from top surface of bridge deck.
©2023 Beton - Beton-icr.ca. All Rights Reserved.