CLIENT
BRUCE COUNTY
LOCATION
PAISLEY, ONTARIO
DELIVERY-MODEL
BID-BUILD
YEAR COMPLETED
2020
SUMMARY OF WORK
- Implementation of advanced temporary traffic control measures and controls.
- Implementation of environmental measures and controls.
- Removal of existing bridge components and elements.
- Removal of existing concrete Bridge deck edges and soffit repairs and rehabilitation.
- Supply and construction of reinforced concrete.
- Construction of concrete parapet walls with railings.
- Replacement of bridge deck drains.
- Guardrail replacement and extension.
- Bridge deck waterproofing and asphalt placement.
- Road rehabilitation at the approach ends of the bridge.